Initial eligibility and system-document review
SILANGANTECHEmpowering the Future with Sustainable Solutions.← All solutionsMake excess solar count
Net-metering assistance
Net metering uses a bidirectional meter to record electricity imported from the grid and excess renewable electricity exported to it. SilanganTech can help organize the technical information and coordinate the application process with your distribution utility.
What this can do
Built around your
real energy needs.
- 01
Receive applicable bill credits for approved excess exports
- 02
Use the correct metering and interconnection arrangement
- 03
Reduce avoidable application errors and missing documents
- 04
Coordinate technical requirements with the installed solar system
Scope of service
What is included.
Final scope depends on the property, equipment, utility requirements, and approved proposal.
Support preparing required technical information
Coordination of drawings, equipment data, and test records
Guidance through utility submissions and inspections
Assistance responding to technical findings
Commissioning coordination after the required approvals
How we approach it
A clear path from
assessment to support.
Review
We check the customer account, system capacity, equipment, and available documents.
Prepare
Required technical records and application materials are organized.
Coordinate
Submissions, comments, inspections, and corrections are tracked with the utility.
Complete
The approved metering and interconnection steps are verified before normal export.
Important design inputs
What we consider.
- Utility eligibility, rules, fees, and processing time
- System capacity and approved inverter equipment
- Required permits, drawings, certificates, and inspections
- Export credits are governed by utility rules and are not necessarily equal to the full retail rate
Common questions
Before you decide.
Is approval automatic after solar installation?+
No. Net metering has a separate utility application, technical review, inspection, and metering process.
What system size is covered?+
The Philippine standard net-metering program covers eligible renewable-energy facilities up to 100 kW, subject to current utility and regulatory requirements.
Start with your actual usage
See what may suit
your property.
Use the quick estimator for a preliminary starting point, then let our team verify the design.
Start my free assessment →Explore other services